Speakerplans.com Homepage
Forum Home Forum Home > Plans > New Projects Forum
  New Posts New Posts RSS Feed - Builds during the rona
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Builds during the rona

 Post Reply Post Reply
Author
Message
empireavworks View Drop Down
New Member
New Member
Avatar

Joined: 18 October 2020
Location: Derby
Status: Offline
Points: 7
Post Options Post Options   Thanks (0) Thanks(0)   Quote empireavworks Quote  Post ReplyReply Direct Link To This Post Topic: Builds during the rona
    Posted: 18 October 2020 at 3:16pm
Builds during the rona, inc Staiper MS18 miniscoop, tapped pipe and BP6 in various stages of build. More on the way, common plans, proto plans and will add to thread. First real go at cab building, built whenever I've had afternoons free in the garden. Formatted at 500px for mobile viewers. Hope everyone is safe and well. 





























Edited by empireavworks - 18 October 2020 at 3:33pm
Back to Top
MarcoAudio View Drop Down
Registered User
Registered User
Avatar

Joined: 22 July 2017
Location: U.K
Status: Offline
Points: 35
Post Options Post Options   Thanks (0) Thanks(0)   Quote MarcoAudio Quote  Post ReplyReply Direct Link To This Post Posted: 21 October 2020 at 4:08pm
Love the Chewbacca sock's......seriously though great build, really solid work
Back to Top
empireavworks View Drop Down
New Member
New Member
Avatar

Joined: 18 October 2020
Location: Derby
Status: Offline
Points: 7
Post Options Post Options   Thanks (0) Thanks(0)   Quote empireavworks Quote  Post ReplyReply Direct Link To This Post Posted: 21 October 2020 at 4:12pm
Originally posted by MarcoAudio MarcoAudio wrote:

Love the Chewbacca sock's......seriously though great build, really solid work

Haha, I've just spotted those looking back. Thanks mate, take care. 
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.06
Copyright ©2001-2023 Web Wiz Ltd.

This page was generated in 0.094 seconds.