bugger long week had, but some results (didnt get pictures of a lot as was too busy - site tech). Was plymouth students end of year ball.
Local band stage, engineered by SP member Corticle. Opus SB218 bins and CS750 tops off QSC HD amps, Opus mp400 monitors off rmx2450's, lighting LEDJ stagecolour24's and pair of white parcans on 6m trilite and winchies. Looked pretty nice, and sounded pretty good. Shame the drivers in the bins are old and shagged!!


Bought SP member fuzzylogic in to do our mainroom in union with hogs, novasound kick and F1 tops. Had Ntrance logistics redlight and some other folks play. Heaviest bass ive heard in that room, lots of compliments from friends about it. Were moments where the bass sounded strained but that may well have been during redlights set where everything was being spanked, i dont know any of the artists who played thus didnt know what i was hearing whenever i wondered through. Driven off JBL MPX1200's and ultradrives. Tannoy coaxials on stage. LX lightjockey EFX600's and robe colourspot300's.

Outdoor stage, wretch32 in picture, professor green headline, headphone disco latest. Rig was nexo alpha 4stacks. Lights LEDJ pars, robe colourspot1200's strobes etc. Monitors opus MP550's. Provided by Impact Newquay. Brilliant crew, had a good laugh this week.


main hall, opus SB218 and AT1000 PA off opus HD, MP550 monitoring with sb218+at1000 side fills! headline band wombats. LX iMoves, pars, LEDJ pixelbars, strobes, four blue lasers one per truss, and a large central, jem machine etc... Looked and sounded amazing, wombats headline. Only a pic from the wings, then a timelapse of the first rigging day - midtop's etc added at a later time.

'Illusion' - our regular nightclub 2nd room, with a spot of UV decor, Opus 215's and tops rig etc

'north marquee' - was a large tent with bar, oxygen bar, and karaoke man in (aweful sound and lighting, smiley face EQ), some nice decor and ambient lighting from LEDJ spectra panels.

Was also an acoustic stage in a similar marquee with a dynacord/Fohnn rig in, VIP marquee with an eliminator rig, funfair etc. I was running the team responsible for all site power, the non main stages (they were contracted), changearounds, rigging, etc etc. 100+hour week, with a 23hour day yesterday doing it all.
Edited by mk2_ginger_biscuit69 - 29 May 2011 at 5:00pm